Start to Finish (Residential)

Pressure testing the slinkies

Excavating the trench with benches

The trench is complete and ready for the slinky to be installed

The pipe has been installed and is being fused at the header pit

In the header pit ready for fusing

Fusing the supply and return lines to the header

The header pit with lines running to the structure

Supply and return lines running from the header to the structure

The manifold is ready for installation

The manifold is almost complete

The manifold is completely installed and the system is ready for purging